allbet欧博真人客户端www.aLLbet8.vip}是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

免费足球预测www.hgbbs.vip)是国内最权威的足球赛事报道、预测平台。免费提供赛事直播,免费足球贴士,免费足球推介,免费专家贴士,免费足球推荐,最专业的免费足球预测网。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。 环球UG官网声明:该文看法仅代表作者自己,与本平台无关。转载请注明:allbet欧博真人客户端:KPower gets four-year PPA extension
发布评论

分享到:

新2足球网址(www.99cx.vip):Emkay Group founder Mustapha Kamal passes away at 73
2 条回复
  1. Telegram分享群组(www.tel8.vip)
    Telegram分享群组(www.tel8.vip)
    (2022-10-29 00:16:31) 1#

    妥妥的好文

  2. 黑玫瑰。
    黑玫瑰。
    (2022-11-14 00:47:58) 2#

    感觉已经火了

发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。